BOQ preparation and quantity takeoff
Service Detail

BOQ Preparation &
Construction Estimating

Structured bills of quantities, detailed measurement and priced schedules — ready for tender submission.

What We Deliver

Everything You Need to Submit

Bill of QuantitiesStructured, trade-itemised BOQ
MeasurementFull takeoff from drawings
Pricing SchedulesRates and extensions
Tender DocumentationSubmission-ready packs
Quantity TakeoffsDimensions, counts, volumes
Cost PlanningElemental & stage estimates
Example Structure

How a BOQ Looks

Clear itemisation, drawing references and units — designed for subcontractor comparison and tender submission.

RefDescriptionQtyUnitRateAmount
2.1Excavate to reduce levels1,240m³——
2.2Disposal of excavated material980m³——
3.1Concrete in foundations C30186m³——
4.1Facing brickwork, outer leaf2,450m²——
4.2Dense blockwork, inner leaf2,380m²——
5.1Reinforcement to RC frame42.5t——
Measurement Standards

Industry-Aligned Measurement

All BOQs and estimates prepared to recognised UK measurement conventions.

NRM2

New Rules of Measurement — detailed measurement for building works. The current standard for most UK building projects and main contractor BOQs.

SMM7

Standard Method of Measurement 7th Edition — still widely specified on many projects and preferred by some clients and contractors.

CESMM

Civil Engineering Standard Method of Measurement — used for civil engineering, infrastructure and groundworks packages.

Need a BOQ for Your Next Tender?

Send us your drawings and scope. We’ll confirm coverage, measurement standard and programme within 24 hours.

Get a Free Quote