BOQ Preparation &
Construction Estimating
Structured bills of quantities, detailed measurement and priced schedules — ready for tender submission.
Everything You Need to Submit
How a BOQ Looks
Clear itemisation, drawing references and units — designed for subcontractor comparison and tender submission.
| Ref | Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 2.1 | Excavate to reduce levels | 1,240 | m³ | — | — |
| 2.2 | Disposal of excavated material | 980 | m³ | — | — |
| 3.1 | Concrete in foundations C30 | 186 | m³ | — | — |
| 4.1 | Facing brickwork, outer leaf | 2,450 | m² | — | — |
| 4.2 | Dense blockwork, inner leaf | 2,380 | m² | — | — |
| 5.1 | Reinforcement to RC frame | 42.5 | t | — | — |
Industry-Aligned Measurement
All BOQs and estimates prepared to recognised UK measurement conventions.
NRM2
New Rules of Measurement — detailed measurement for building works. The current standard for most UK building projects and main contractor BOQs.
SMM7
Standard Method of Measurement 7th Edition — still widely specified on many projects and preferred by some clients and contractors.
CESMM
Civil Engineering Standard Method of Measurement — used for civil engineering, infrastructure and groundworks packages.
BOQs by trade package
Need a BOQ for Your Next Tender?
Send us your drawings and scope. We’ll confirm coverage, measurement standard and programme within 24 hours.
Get a Free Quote